Electricity & water will be charged for the following areas:
New East
Old East
Undergraduate Village
Graduate Student Village
Junior faculty (Segel Zutar)
Canada buildings 944-931
Electricity will be charged for the following areas:
Ha’Amim
Senate
Newe America
Canada buildings 961-945
Questions and clarifications regarding the electricity meters, electricity and water payments:
Supervisor of the electricity and water meters – hashmal.meonot@dp.technion.ac.il
All questions / clarifications in regards to electricity issues should be made via the above specified email with the electricity supervisor.
Replies will be sent by email. You may leave a phone number to request a call back and/or request to schedule an appointment if necessary.
In each apartment, in accordance with the number of roommates, electricity consumption will be divided equally between all roommates in the apartment.
The automatic electricity meter system is linked to the rent collection system, and students will be charged accordingly.
The installation of electricity meters at the Technion was done in order to encourage a reduction in electricity usage.
Furthermore, the rates for students are lower than the typical rates of the electric company.